Program Description

Course Obejectives

  • Understand the methods for assessing surface conditions and subsurface investigation techniques to effectively evaluate geological conditions for metro construction projects.
  • Gain insights into laboratory and in-situ testing techniques for analyzing the mechanical behavior of rocks and soils, ensuring structural integrity and stability in metro construction.
  • Discuss the construction methods of elevated stations and viaducts, including substructure construction techniques and challenges encountered in foundation construction for elevated metro structures.
  • Explore the development of precast yards for efficient production and assembly of precast elements in metro viaduct construction, enhancing construction productivity and quality.
  • Understand the principles and applications of various tunneling methods, such as cut and cover, boring, drill and blast, NATM, and NMT, in metro tunnel construction, considering geological conditions and engineering requirements.
  • Explore support systems and construction techniques for underground metro stations, including diaphragm walls, top-down, and bottom-up construction methods, ensuring stability and safety during station construction.

Key Highlights

check svg

Site investigation for Metro Rail Projects.

check svg

Metro Viaduct erection methods.

check svg

Challenges in Metro Rail construction.

check svg

Precast yard development for Metro projects.

check svg

Tunnel Construction methods.

Course enrollment data

Learning Format

Online

Duration

5 Units

Certified by

IITM Pravartak Technologies Foundation
Technology Innovation Hub (TIH) of IIT Madras and
L&T EduTech

Program Fee

₹1900 (inclusive of tax)

Downloads

Program Description

Education Qualification

Students pursuing Diploma/ UG / PG Programs in Civil Engineering

Suggested Prerequisites

Soil Mechanics, Foundation Engineering, Structural Analysis

Teaching Hours

10 hours

Lead Faculty

T Cibin Engineering Manager -Metros, Heavy Civil Infrastructure, L&T Construction.

A Professionally motivated Structural Engineer with 12 years of experience in Design of Reinforced Concrete, Structural Steel, Composite, Timber and Masonry structures. Possess a diverse experience in Heavy Civil Engineering including Underground Metros, Tunnels, Defence & Marine Structures

Learning Schedule

Surface and subsurface investigations, in-situ testing methods for rocks and soil, in-situ testing methods for rocks and soil

Elevated Metro viaducts , Metro Viaduct Erection methods, Pre-Cast Yard Development , Formwork in metro projects , Substructure construction methods , challenges in foundation construction of Metros

Rock mass classification, Cut and cover method, Drill and blast method, NATM,NMT, Comparison between NATM and NMT

Tunnel support systems, Rock Bolts, Anchors , shotcrete, Reinforced Rib Shotcrete ,Lattice girders and steel arches. Pre excavation support systems , Introduction to Pre excavation support systems ,Purpose of Pre excavation support systems ,Ground Freezing method ,Umbrella arch method -I, Face grouting ,Pre grouting and Types of Pre grouting

Introduction and purpose of instrumentation and monitoring, Instrumentation and monitoring planning, Typical geotechnical measuring systems for underground tunnels ,Typical geotechnical measuring systems for underground tunnels ,Loads and stresses in support system and water pressure monitoring, Project case study , Trigger limits and monitoring plan



Are you interested in this program?

Our Learning Partners

Want To Know More

Guiding Star with Our Help!

Contact Us